Morro Bay Estuary Ecosystem Restoration Feasibility Study Draft F3 Conference Report without-Project Conditions Analysis

Resource Type: 
Documents
Categories
MBWMP Priority Issues: 
SED-8 Increase estuary circulation
MBWMP Priority Issues: 
HAB-05 Dredging activity restoration
MBWMP Priority Issues: 
HAB-08 Eelgrass restoration
Locations: 
Morro Bay Estuary
Category: 
Oceans and estuaries
Keywords: 
sediment
Keywords: 
habitat
Keywords: 
restoration
Keywords: 
army corps of engineers
Keywords: 
estuary
Keywords: 
tidal circulation
Keywords: 
flushing
Keywords: 
inter-tidal habitat
Citation Information (FGDC)
Full Title: 
Morro Bay Estuary Ecosystem Restoration Feasibility Study Draft F3 Conference Report without-Project Conditions Analysis
Originator: 
Us Army Corps of Engineers Los Angeles District
Publication Date: 
20080503
Extended Information (FGDC)
Abstract: 
This report presents an analysis of existing conditions and projected future without project conditions that examines ecosystem needs and opportunities at the Morro Bay Estuary in Morro Bay, San Luis Obispo County, California. Ecosystem problems and restoration opportunities identified in the analysis are used in the preliminary screening of alternative improvemetn measures. This report identifies and presents a preliminary evaluation of potential structural and non-structural ecosystem restoration and aquatic habitat protection measures. The analysis supports the decision to proceed with the feasibility study as presented in the concluding section of the report, based upon the projected significant anthropogenic, sediment-induced change in estuary habitats. *NOTE: This is a Draft version. Information contained in this report should be treated as such. No final version was produced.